Home PC & LaptopHardware Intel Sets Panther Lake “Core Ultra 300” CPU Launch For 2026, Full Production Commencing Later This Year

Intel Sets Panther Lake “Core Ultra 300” CPU Launch For 2026, Full Production Commencing Later This Year

by admin

Intel has announced that its next-gen client CPU platform, codenamed Panther Lake, will launch in 2026 with production commencing later this year.

Intel Sets Early 2026 As The Launch Timeframe For Its Next-Gen Client CPU Platform Codenamed Panther Lake

Intel’s Panther Lake CPUs will be the first to feature the 18A process node, which is going to be the next full-fledged advancement beyond the company’s Intel 3 process. The new technology will use several new packaging technologies and innovations and is all set for high-volume production later this year.

The Intel Panther Lake CPU family was originally planned for launch in 2H 2025 but the Blue Team is now stating a 2026 launch. Based on previous information, Panther Lake was going to see a soft launch in 2H 2025 with limited availability with higher volume being shipped in early 2026. This is now confirmed by Intel themselves.

Based on known information, Intel’s Panther Lake CPUs will feature brand-new Cougar Cove P-Cores along with Skymont E-Cores. The CPU is expected to feature 6 P-Cores and 8 E-Cores and targets mobile platforms. The biggest upgrade on Panther Lake will be the new Xe3 “Celestial” graphics architecture which will be used for the iGPU portion. The chip will feature up to 12 Xe3 cores and will be packaged together in a chiplet fashion.

The main chip will feature a total of five dies with two larger portions for the compute and GPU tiles and the other dies housing the IO, SOC controllers and a dummy die. The chips will scale from 15 to 45W, and you can learn more about the various SKUs here.

Panther Lake will be the follow-up to Intel’s Arrow Lake and Lunar Lake lineup, with the former targeting “Performance” and the latter targeting “Power Efficiency”. With Panther Lake, Intel aims to combine the best of both of these products and scale 18A. The next product to succeed Panther Lake CPUs will be Nova Lake, which should be aiming for a late 2026 launch.

Intel Mobility CPU Lineup:

CPU Family Panther Lake Lunar Lake Arrow Lake Meteor Lake Raptor Lake Alder Lake
Process Node (CPU Tile) Intel 18A TSMC N3B Intel 20A
TSMC N3B
Intel 4 Intel 7 Intel 7
Process Node (GPU Tile) TSMC 3/2nm? TSMC N3B TSMC N4? TSMC 5nm Intel 7 Intel 7
CPU Architecture Hybrid Hybrid (Dual-Core) Hybrid (Triple-Core) Hybrid (Triple-Core) Hybrid (Dual-Core) Hybrid (Dual-Core)
P-Core Architecture Cougar Cove Lion Cove Lion Cove Redwood Cove Raptor Cove Golden Cove
E-Core Architecture Skymont? N/A Skymont Crestmont Gracemont Gracemont
LP E-Core Architecture (SOC) Skymont? Skymont Crestmont Crestmont N/A N/A
Top Configuration 6+8 (H-Series) 4+4 (MX Series) 6+8 (H-Series)
2+8 (U-Series)
6+8 (H-Series)
2+8 (U-Series)
6+8 (H-Series)
8+16 (HX-Series)
6+8 (H-Series)
8+8 (HX-Series)
Max Cores / Threads TBD 8/8 14/14 14/20 14/20 14/20
AI NPU NPU5 (TBD TOPS) NPU4 (48 TOPS) NPU3.5 (TBD) NPU3 (11 TOPS) NPU2 (7 TOPS) NPU2 (7 TOPS)
Planned Lineup Core Ultra 300 Core Ultra 200V Core Ultra 200 Core Ultra 100 14th/13th Gen 12th Gen
GPU Architecture Xe3-LPG (Celestial) Xe2-LPG (Battlemage) Xe-LPG+ (Alchemist) Xe-LPG (Alchemist) Iris Xe (Gen 12) Iris Xe (Gen 12)
Xe Cores (Max) 12 Xe3 Cores 8 Xe2 Cores 8 Xe Cores 8 Xe Cores 96 EUs (768 Cores) 96 EUs (768 Cores)
Memory Support TBD LPDDR5X-8533 DDR5-5600
LPDDR5-7500
LPDDR5X-8533
DDR5-5600
LPDDR5-7400
LPDDR5X – 7400+
DDR5-5200
LPDDR5-5200
LPDDR5-6400
DDR5-4800
LPDDR5-5200
LPDDR5X-4267
Memory Capacity (Max) TBD 32 GB 128 GB 96 GB 64 GB 64 GB
Thunderbolt Ports TBD TBD TBD 4 (TB4) 4 (TB4) 4 (TB4)
WiFi Capability TBD WiFi 7 TBD WiFi 6E WiFi 6E WiFi 6E
TDP TBD 17-30W TBD 7W-45W 15-55W 15-55W
Launch 2H 2025 2H 2024 2H 2024 2H 2023 1H 2023 1H 2022

Source link

Related Posts

Leave a Comment